Curtain wall project management

(1) Safety training
Safety training is an important part of every glass curtain wall project before the construction of the construction unit should do a good job in the safety training work before the project construction. Make clear the safety responsibility consciousness of construction personnel, conduct three-level safety education for each new construction personnel, make them fully aware of the internal relationship between specific construction operations and safe production, urge them to install safe operation standards, and carry out relevant site operations. The safety management measures involved in the construction should be consistent with the construction contract, and the actual operation should be carried out strictly in accordance with the relevant technical standards, and the construction personnel should be regularly organized to carry out safety and technical training to improve their construction technology, so as to ensure the safety and reliability of the curtain wall construction.


(2) Implementation of the program
The on-site installation of glass curtain wall is different from other construction projects, in the installation process, due to the design of the construction scheme, the construction process will lose continuity. Therefore, in the design work of glass curtain wall, we should choose the design unit with strong professional qualifications, and in the design process, we should communicate with all parties to ensure the accuracy and rationality of the scheme design, and promote the effective implementation of the scheme in the process of modern curtain wall.
In the scheme design of glass curtain wall, detailed emergency measures should be taken to ensure the reasonable connection between project design and construction. In the design of beam and column of curtain wall, attention should be paid to the structure and size of each component in line with the actual requirements, and the flatness and verticality in the installation process should be maintained.
(3) Quality acceptance
Glass curtain wall quality acceptance is the key step in the project construction management work, its quality directly affect the safety of buildings later use it or not. In the process of inspection and acceptance, project managers need to inspect glass curtain wall engineering construction quality, conform to the development of green building concept, related to the use of raw materials and construction technology of the choice whether to meet the requirements of sustainable development, These aspects are examined to improve the level of awareness of the overall quality of the curtain glass window.
Glass curtain wall engineering in the process of construction, not only to pay attention to the key points of construction, but also need to in the actual work through the safety and technical training of construction personnel, the implementation of the project design scheme and strengthen the quality acceptance strategy and method, reduce the emergence of quality and safety problems.