Steel Pipes Knowledge steel-pipes-knowledge

Your position:Home > Steel Pipes Knowledge > Curtain Wall Construction Scheme

Mobile: 008618202256900

Contact us Email:steel@fwssteel.com 

Feed and Linkedin page

Recent posts1

Curtain Wall Construction Scheme

Component curtain wall and unit curtain wall or assembled curtain wall in addition to the differences in the structure system, the site of the construction scheme is obviously different, this performance in the use of unit curtain wall or assembled curtain wall, the technical content and advanced degree of the construction scheme have been significantly improved. Component type curtain wall construction plan, still appears as the traditional construction technology, with “prop fell back to the original stage, component materials are calculated by bulk components processing after loading in the factory delivery to the site, in the material, are the bulk component, which can’t use forklift or crane to unload, only using artificial handling to unloading, transshipment. The bulk components can only be transferred to each floor by the construction elevator of the general contractor when the component materials go upstairs.

The efficiency of material transfer is low. During the installation and construction, the workers shall carry out the construction work in the hanging basket, and the workers shall be assigned indoors to assist in carrying and transferring the materials. At the same time, measures for spider glass curtain wall shall be taken in the whole process to prevent the fall of loose materials. Instead of prefabricated wall, a large number of artifacts had been assembled into large plate inside the factory, the finished plates of large area in the workshop directly uses the analysis crane loading, transportation to the scene, directly USES the tower crane (or auto cranes, forklifts, etc.) for unloading, the secondary transport transshipment is the use of tower crane or forklift, when installation using the special crane hoisting directly from the ground, to avoid more site two manual handling, in the whole process of construction, can use mechanical operations, big star saves manpower, and greatly reduces the probability of safety accidents, construction efficiency is also greatly improved. Therefore, the on-site construction of the assembled glass curtain wall has many advantages that the traditional component curtain wall cannot compare with.

Under the premise that the business cost has been controlled in advance, the component curtain wall can still be transformed to the assembled curtain wall without increasing or less the comprehensive cost, so that the processing quality, installation quality, appearance quality of the curtain wall and many other aspects have been significantly improved and enhanced than the conventional component curtain wall building. At the same time, the construction environment, construction safety, construction progress, civilized construction image and other aspects of the site are significantly improved than the component curtain wall, which is worthy of promotion and application.

Tel: +86 18202256900 Email: steel@fwssteel.com

Name:
Email
Leave a message: